Middleton, Idaho
Ardurra completed the survey, design, right-of-way, and construction of this project. This was completed as three projects in the corridor, connecting Cemetery Road Phase 1 to the Sawtooth Lake Drive Crossing projects. This section included full roadway design, curb, gutter and a paved 10’ wide pathway. Storm drainage facilities, estimates, and specifications were also completed on-time and within budget.