Pearland, TX
Ardurra was selected to provide engineering services for facility improvements to include analysis of the service area, determination of ultimate plant flow, analysis of the existing plant to accommodate expansion, regulatory requirements, and end of service life improvements. Ardurra provided recommendations and is currently designing improvements to allow for a phased expansion from the current average daily flow of 4.0 MGD to a capacity of 6.0 MGD, with an ultimate capacity of 8.0 MGD.