Pearland, Texas
Ardurra is currently providing professional engineering and consulting services to aid the City of Pearland in the funding, development, consultant evaluation, technical review, water master plan, AMI conversion program, management of construction activity, and warranty support for the $159M surface water treatment plant program.
The overall program consists of a raw water intake from the American Canal, pre-sedimentation basin, 10 MGD surface water plant, high service distribution pump station, and 60,000 linear feet of large diameter transmission main. The TWDB funding application process started in May of 2016 and the overall project is expected to run through 2023. Additionally, Ardurra is updating Pearland’s water model and CIP based on the last five years of growth and looking forward to ultimate buildout.