Raleigh-Durham, NC
RDU identified the need to rehabilitate portions of Taxiway F based on a pavement assessment completed in 2015. The results identified several sections of Taxiway F, which were in fair to poor condition, based on the current PCI values.
Ardurra (WK Dickson) provided design, bidding, and construction phase services for the $27M pavement rehabilitation project. The team evaluated and addressed complex issues with construction phasing, staging, and access throughout the schematic design phase. In addition to the pavement rehabilitation, this project also included rehabilitation of existing paved shoulders, construction of new paved shoulders where none existed, subsurface drainage improvements, and new pavement markings within the project limits identified above. Electrical engineering for the project included the installation of centerline cans and conduit only, rehabilitation or replacement of taxiway edge lights and circuitry associated with new paved shoulders and fillet revisions, and taxiway signage evaluation and replacement.