Laguna Beach, CA
South Coast Water District's Reservoir 2B Replacement Project, led by Ardurra as the prime consultant and Peterson Structural Engineers (PSE) as the structural engineer of record, replaced an aging, seismically vulnerable 0.1 million-gallon steel reservoir with two modern 0.1MG AWWA D100 welded-steel tanks. Located on a steep, constrained hillside in South Laguna Beach's wildland-urban interface, the project required innovative engineering solutions to deliver critical fire protection and water infrastructure resilience.
Key Project Highlights:
The project advances South Coast Water District's Wildfire Mitigation and Fire Safety objectives, ensuring reliable drinking water and fire protection for a high-risk community. By introducing redundancy and applying advanced seismic design standards, the new system provides lasting resilience against earthquakes and wildfires while protecting rate payer investments through durable, low-maintenance infrastructure.
The project received a 2026 ACEC-California Engineering Excellence Commendation Award.