Phoenix, Arizona
Ardurra is providing utility coordination services for the reconstruction of I-10 between SR 202L and I-17, also known as the I-10 “Broadway Curve”. As the largest urban freeway reconstruction project in Maricopa County, this project will widen I-10 to six general purpose lanes and two high-occupancy vehicle lanes in each direction. Additional work will occur on approximately one mile of east- and westbound US 60 between I-10 and Hardy Drive and on approximately one mile of north- and southbound SR 143 between I-10 and the southern end of the SR 143 bridge over the Salt River. This project is being delivered as a Public-Private Partnership as a Design/Build and by a joint venture developer.