Orange County, Florida
This project includes approximately 1.1 miles of a new four-lane urban roadway with an intersection modification at Boggy Creek. Additional elements include surveying, drainage evaluation and design, permitting, lighting, signing and pavement markings, maintenance of traffic, utility design and coordination, geotechnical analysis, scheduling and project controls, progress reporting and other associated tasks and activities. Ardurra is responsible for Roadway Drainage design and Environmental/Permitting services for the proposed SR 534 Segment 2A. The project will extend Simpson Road from the existing intersection with Boggy Creek Road to the CFX Limited Access ROW line for SR 534. This project includes approximately 1.1 miles of a new four-lane urban roadway with an intersection modification at Boggy Creek.