Houston, Texas
Ardurra provided, as a subconsultant to Huitt-Zollars, Inc., Traffic Engineering Services with regard to the proposed Route #39 developed as part of the reimagining of METRO bus routes system. The proposed bus route would operate between Northwest Transit Center (NWTC) and Kirkwood Drive. The purpose of the study was to ensure that the proposed Bus Route 39 would not significantly impact existing traffic operation along IH-10 Frontage Road.
Ardurra provided a comparison study of “before” and “after” travel times during AM and PM peak periods before the bus line was implemented.
Services provided by Ardurra included: