This project includes a 24-inch sewer force main for the Eagle Sewer District (ESD). Ardurra assisted in the sizing and routing analysis which included several sensitive wildlife habitats and limited undeveloped area for easements. The sewer main runs along SH-44 through the heart of Eagle, across three different developments with two river crossings.

This project connects the ESD treatment facility to the West Boise Wastewater Treatment Works and will provide adequate flow capacity for the entire build out of ESD’s service boundary. The project includes nearly 1/2-mile of horizontal directional drilling, several additional borings, extensive permitting with ITD, IDL, ACOE, and the City of Eagle.