New Bear Lake Maintenance Facility Project Management Services
Corpus Christi, TX
Managing a $46M FTA-funded transit facility to strengthen South Texas transit operations.
Ardurra is serving as prime consultant and owner's advisor for the Corpus Christi Regional Transportation Authority's (CCRTA) Bear Lane Maintenance Facility, a major Federal Transit Administration-funded capital investment in South Texas public transit infrastructure. The project will replace CCRTA's existing 50-year-old maintenance facility with a modern, approximately 65,000-square-foot facility featuring 21 maintenance bays and structural design requirements to withstand a Class 4 hurricane environment.
Ardurra's project management services span the full project lifecycle, including procurement and contract document review, issue and risk tracking, schedule and cost oversight, and coordination support to keep the design-bid-build delivery on track. The team also provides critical Federal Transit Administration compliance assistance, ensuring CCRTA meets grant requirements tied to the project's $46.28 million in FY 2025-26 Low or No Emission Grant Program funding.
Construction is expected to begin in September 2026 and continue for approximately two years. The completed facility will give CCRTA a resilient, modern maintenance platform to support daily transit service and sustain operations during regional emergencies, advancing long-term fleet reliability and emergency preparedness for the Corpus Christi region.
Key Highlights:
-
Replaces a 50-year-old maintenance facility with a modern, 65,000 SF structure featuring 21 maintenance bays, significantly expanding CCRTA's fleet maintenance and operations capacity.
-
Secures and manages $46.28 million in FTA Low or No Emission Grant Program funding, representing a major federal investment in South Texas public transportation infrastructure.
-
Incorporates Class 4 hurricane-resilient design standards, enabling CCRTA to maintain uninterrupted transit operations during regional emergencies and strengthening the agency's emergency preparedness posture.
-
Provides end-to-end owner's advisor services, including procurement support, risk tracking, schedule and cost oversight, and FTA compliance, to protect CCRTA's investment throughout the project lifecycle.
- Positions CCRTA for long-term service reliability and fleet expansion, with construction set to begin in September 2026 and a two-year build timeline to deliver the facility ahead of growing regional demand.
Ardurra's project management and owner's advisor services are helping CCRTA deliver a transformative capital investment that replaces aging infrastructure with a resilient, modern transit maintenance facility. By securing and managing $46.28 million in federal grant funding and maintaining rigorous FTA compliance, Ardurra is safeguarding CCRTA's investment and ensuring the project delivers lasting value for Corpus Christi residents. The Bear Lane Maintenance Facility will position CCRTA to provide reliable, sustainable public transportation for South Texas for decades to come.
Project Information
Market
Transportation, Public Works
Client
Corpus Christi Regional Transportation Authority (CCRTA)
Delivery Method
Design-Bid-Build
Services
- Project management planning and oversight
- Procurement and contract document review
- Issue and risk tracking
- Schedule and cost oversight support
- Construction-phase readiness and coordination
- Federal transit administration (FTA) compliance assistance