Peddie Lake Dam Pedestrian Bridge
Hightstown, NJ
Engineering a new pedestrian bridge over Peddie Lake Dam
Ardurra provided design and construction administration services for the Peddie Lake Dam Pedestrian Bridge project in Hightstown, NJ, funded through the federal Highway Administration (FHWA) and administered by the New Jersey Department of Transportation (NJDOT). The project scope encompassed furnishing, construction, and installation of a new pedestrian bridge, concrete foundation repairs to the existing dam structure, installation of electrical conduits for walkway lighting, removal and reconstruction of sidewalk and stairs to comply with ADA standards, demolition of bulkheads, walls, railings, and handrails, construction of ramps, stone knee walls, and planters, relocation of existing light fixtures, grading and landscaping, and coordination with NJ Department of Environmental Protection (NJDEP) and Safety. Ardurra's field director provided full-time detailed inspections to ensure construction was completed in conformance with the approved plans, specifications, FHWA and NJDOT requirements, and the Borough of Hightstown's General Permit Program Policies and Procedures Handbook. Ardurra also provided construction administration services including reviewing the contractor's baseline schedule prior to construction, arranging and leading the preconstruction meeting, shop drawing review support, review of change orders and contract payments, providing progress reports, and obtaining project close-out documents.
Key Highlights:
-
Contractor operations were monitored to ensure pedestrian safety throughout the project; the park was maintained during work and non-work hours.
-
The project required maintaining unimpeded ADA-compliant pedestrian access through the work zone at all times during construction.
-
Ardurra provided on-site inspection at all times while work was performed over the 180-calendar day duration of the project.
Ardurra successfully delivered design and construction administration services for the Peddie Lake Dam Pedestrian Bridge, restoring ADA-accessible public access to a key community connection. The project maintained continuous pedestrian access throughout construction and was completed in conformance with FHWA, NJDOT, and municipal requirements, strengthening Ardurra's track record in federal-aid transportation delivery across New Jersey.
Project Information
Market
Transportation
Client
Borough of Hightstown
Delivery Method
Design-Bid-Build
Services
- Survey & Base Mapping
- Structural Bridge Design
- ADA Accessibility Planning
- Electrical Conduit Design for Walkway Lighting
- Removal & Reconstruction of Sidewalk and Stairs
- Construction Administration & Inspection
- Coordination with NJ DEP and NJDOT