Torrance Transit Regional Park-And-Ride Terminal

Torrance, CA

Construction management for LEED Gold Torrance Transit Center on 15 acres

Ardurra provides construction management, inspection, and special deputy inspection and testing services for the 15,000-square-foot regional Torrance Transit Center on 15 acres along Crenshaw Boulevard near the 405 Freeway. The strategic hub connects Torrance Transit's multi-line bus service to other regional providers and anticipates future Metro Green Line connectivity as part of the Green Line Master Plan.

The LEED Gold-standard terminal features eight bus bays with passenger drop-off zones, layover space, and an approximately 250-space parking lot, supporting enhanced regional transit connectivity. The two-phase construction approach completed rough grading and underground drainage systems in Phase 1, with Phase 2 encompassing buildings, parking, circulation roads, and utilities over a 12-14 month timeline.

Key Construction Management Services:

  • Managing 15,000 SF regional transit center construction on 15-acre site with LEED Gold certification standards

  • Overseeing a two-phase construction approach with Phase 1 site preparation and Phase 2 building and infrastructure development

  • Providing inspection services, including special deputy inspection and testing throughout construction phases

  • Managing a bus bay terminal construction with passenger amenities and a 250-space parking lot infrastructure

  • Coordinating off-site improvements, including 208th Street cul-de-sac extension and Crenshaw Boulevard widening with traffic signals

  • Ensuring LEED Gold compliance through specialized inspection protocols and sustainable construction practices

  • Supporting 12-14 month construction timeline with comprehensive project oversight and quality assurance services

The transit center's construction provides Torrance with enhanced regional connectivity, while demonstrating sustainable construction practices and multimodal transportation integration. A strategic location near the 405 Freeway and an anticipated Metro Green Line connection establish the foundation for expanded regional transit services.