Piedmont Triad International Airport Aviation Tenant Site Development (HAECO)


Greensboro, NC

HAECO is the world’s leading independent aircraft engineering and maintenance group. WK Dickson helped take a 20-acre undeveloped site at the airport and turn it into a facility that supports a new aircraft apron, hangar, and other features for HAECO Airframe Services.

Ardurra (WK Dickson) provided final design, bid, and construction phase services for a 20-acre undeveloped site at the airport to support a new aircraft apron, hangar, and other features for HAECO Airframe Services. Design work included grading the site with fill material from a borrow site on airport property, designing a storm drainage system that conveys drainage from the airfield through the site, and designing the stormwater management system, including the water quality and water quantity treatment of the ultimate site development. The project also included preparing multi-phased erosion control plans for the project site. The scope of services includes project administration, 401/404 permitting plan preparation, final design and plan preparation, erosion control permitting, NCDOT encroachment agreement coordination, topographic survey, geotechnical investigation, and bidding services.