Ardurra (dba 300 Engineering Group, LLC) is providing design services related to drainage, water, and sewer engineering for the subject Construction Manager at Risk (CMAR) Project. The improvements for this project are summarized below:

Airside Drainage:

  • Replacement of the existing canal by a 42-inch reinforced concrete pipe (RCP)
  • Analyzing the proposed apron extensions into the existing detention areas West of Terminal 4.
  • Reviewing maximum stage elevations to ensure minimum freeboard is maintained

Landside Drainage:

  • Drainage design for a temporary perimeter road
  • Design of a stormwater management system

Potable Water & Fire Protection Design:

  • Design of a 12-inch ductile iron pipe (DIP) service line for the terminal’s potable and fire water supply

Sanitary Sewer Design:

  • Relocation of the existing 8-inch force main (FM) and 8-inch gravity sewer