Uptown Bus Rapid Transit (BRT) Line North Extension Feasibility Study
Houston, Texas
Ardurra provided planning services with regard to the Uptown BRT Line North Extension Feasibility Study (Inner-Katy) to CBD in Houston, Texas. Ardurra studied the feasibility of adding an HOV lane along Inner Katy between IH-610 to CBD and also looking at better connections within the CBD to the Green/Purple Line. Some of the tasks performed were:
- Evaluate three alternatives to add HOV lane NWTC to CBD along Inner Katy by developing conceptual layouts and typical sections.
- Connect alternative concepts to Green/Purple Lines to the convention Center via Rusk and Capitol.
- Evaluate mobility impacts of the alternative for the Year 2020.
- Prepare budgetary cost estimates for the three alternatives.
- Substantial Coordination with TxDOT particularly along Inner-Katy corridor.
- Evaluate operational pros and cons of the three alternatives and provide summary sheets.